Smoke Detectors and Co Alarms to become legal requirements for landlords




Landlords in England and Scotland will be required by law to install working smoke and carbon monoxide alarms in their properties from October 2015, it has been announced.
According to Housing Minister Brandon Lewis the move will help prevent up to 36 deaths and 1,375 injuries a year after a consultation showed strong support for the measure.
Fire and rescue authorities in Glasgow are expected to support private landlords in their own areas to meet their new responsibilities with the provision of free alarms, with grant funding from the government.
Lewis explained that it is part of wider government moves to ensure there are sufficient measures in place to protect public safety, while at the same time avoiding regulation which would push up rents and restrict the supply of homes, limiting choice for tenants.
‘In 1988 just 8% of homes had a smoke alarm installed but now it’s over 90%. The vast majority of landlords offer a good service and have installed smoke alarms in their homes, but I’m changing the law to ensure every tenant can be given this important protection,’ said Lewis.
‘But with working smoke alarms providing the vital seconds needed to escape a fire, I urge all tenants to make sure they regularly test their alarms to ensure they work when it counts. Testing regularly remains the tenant’s responsibility,’ he added.

These alarms should be fitted by a qualified electrician or electrical contractor
According to Communities Minister Stephen Williams it will help to create a bigger, better and safer private rented sector. ‘A key part of that is to ensure the safety of tenants with fire prevention and carbon monoxide warning. People are at least four times more likely to die in a fire in the home if there’s no working smoke alarm,’ he said.
‘That’s why we are proposing changes to the law that would require landlords to install working smoke alarms in their properties so tenants can give their families and those they care about a better chance of escaping a fire,’ he added.
The proposed changes to the law would require landlords to install smoke alarms on every floor of their property, and test them at the start of every tenancy. Landlords would also need to install carbon monoxide alarms in high risk rooms such as those where a solid fuel heating system is installed.
Those who fail to install smoke and carbon monoxide alarms would face sanctions and could face up to a £5,000 civil penalty. This would bring private rented properties into line with existing building regulations that already require newly built homes to have hard wired smoke alarms installed.
New regulations will be laid in Parliament to require landlords to install smoke and carbon monoxide alarms in their properties, and are expected to come into force, subject to Parliamentary approval, on 10 October 2015.
The allocation of funding to fire and rescue authorities to offer free smoke and carbon monoxide alarms to local landlords will be announced shortly.
The British Property Federation said the crackdown was necessary to force the small number of landlords who did not install alarms in their properties to bring them up to standard. It added that although most landlords do everything necessary to ensure the safety and comfort of their tenants, making the installation of carbon monoxide and smoke alarms compulsory will give tenants peace of mind and provide clarity to landlords. 
The BPF recommended that the obligation on landlords and their agents should be to ensure that there are working detectors at the time the tenancy starts. There should be an obligation on tenants, however, to maintain and test the alarms and to report any faults.
'It is quick, cheap and easy to install these pieces of equipment, so making them mandatory makes sense, and should weed out those who are currently putting their tenants at risk. While the majority of landlords adhere to best practice and ensure that fire and smoke detectors are installed in every rented property they own, we feel that landlords and tenants can only benefit from this additional safeguard,' said Ian Fletcher, director of policy at the British Property Federation.


Wednesday, 8 April 2015

ELECTRICAL CONTRACTING 101

(see blog post for the heading lols)

Here i have for you a blog about electrical consumer units you know the box that when you have no power it has usually tripped or the fuse wire needs replaced.....enjoy


WESTEND GLASGOW ELECTRICIANS

 FOLLOW US ON FACEBOOK

Warning: To complete electrical works you must comply with Electrical Regulations.

Please also see our project on the New Wiring and Cable Colours.
All cables and connections to the consumer unit must be checked and tested by a qualified electrician. Do not attempt removal or replacement unless you are you are qualified to Part P regulation standards. It is also an offence to interfere with the seals on the electricity meter.
Please see our project on Part P of the building regulations for information on DIY Electrical Installation.

The Consumer Unit

The modern consumer unit is the centre, or heart, of the wiring system in the home. The unit distributes the electricity, via fuses of one kind or another, to the different circuits in the house. The older fuse wires are being replaced gradually by their modern equivalent, the MCB or miniature circuit breaker.
Consumer unit with rcd's
Consumer unit for installation with rcd's

Different Types of Consumer Unit

We will deal with the two main types of consumer unit found in the home today.
The first one is a single load fuse board where the power coming in is taken through a double pole switch to a live bus bar. Each fuse, or MCB, is clipped onto a DIN bar and the "teeth" of the bus bar are inserted into the MCB's. The cables to the house circuits are connected to the other side of the MCB's. All of this is explained more thoroughly when we deal with the second type of unit, which is the split load unit. The photographs are of a split load fuse board. The ordinary consumer unit is exactly the same in principle without the RCD.
Inside of consumer unit
Consumer Unit
Under the 17th edition regulations it is required that every socket is protected by an RCD. This can be done in 3 ways. 
A consumer unit can use an RCD as the main switch. This will protect all circuits but if the RCD trips, so do all circuits. 
A dual RCD consumer unit can be fitted. This unit has one main switch, two RCDs and each circuit has it's own MCB. This allows the circuit to be divided into two, usually one upstairs, one down. This protects all areas including showers and cookers, but if one trips the other will ensure at least some lights and some sockets still work.
An RCBO consumer unit has one main switch but each circuit is protected by an RCBO which is a combination of an MCB and an RCD. This allows protection in full for all individual circuits and if one trips, all others will still work. As this option is expensive it is only usually used where space is tight for the enlargement of a consumer unit as has to happen when updating to a dual RCD unit.
Just as a matter of interest, DIN stands for Deutsche Industrie Norm and, originating in Germany, is any of a series of technical standards, used Internationally, to designate electrical connections, film speeds and paper sizes. Shown in the consumer unit casing above, it is a metal, pressed bar, to which the MCB's clip. They simply push on via a spring loaded lock at their back.
Split Load Board
A split load board is designed for total safety and incorporates an RCD (Residual Current Device, shown as E in the picture above) as well as the double pole switch (D).The split board shown here has one RCD and is a simple version to show the user how the board works. 
An RCD is a manually operated isolator switch, but it is also an automatic safety device that will trip and cut off as soon as it senses an earth fault. There are a number of different ratings for current and sensitivities to current leakage available, so you will need to understand which are the appropriate ratings for your home. RCD's also work by detecting an imbalance between the Live and the Neutral conductors and this feature is a requirement for all Class 2 double insulated equipment.
As they are very sensitive, it is not practical to fit one RCD to protect the whole house. If a fault develops on one circuit, all circuits would be switched off immediately...This would, most often, leave you in the unnecessary position of having no lights or power. Because of this it actually contravenes the most recent (16th Edition) wiring regulations. This is easily prevented by using an RCD in conjunction with a main, double pole isolating switch so that it protects only some of the more vulnerable circuits. This then becomes a split load consumer unit and is shown above. The key to this photo is..
  • A: Neutral terminal block for the main isolating switch side of the unit
  • B: Neutral terminal block for RCD side of the unit
  • C: Earth terminal block (takes both sides of unit)
  • D: Main double pole isolating switch
  • E: Generally 80 - 100 Amp RCD with 30mA (milliamp) sensitivity
  • F: Neutral link cable from Main switch to terminal block
  • G: Live feed from main switch to RCD
  • H: Neutral link cable from main terminal block to RCD
  • I: Neutral link cable from RCD to RCD neutral terminal block

RCD's

The use of RCDs is necessary, on two occasions, to meet the wiring regulations. The first of these is to protect any socket which may be reasonably expected to supply equipment outside the house (Strimmers, lawn mowers, hedge trimmers, pond pumps, sheds, lights etc etc). This rule pretty much covers every single socket in the house so the ring main should be placed on the RCD protected side of the consumer unit.
RCDs have a test button which creates an earth leak with a resistor, and it is usually recommended that they are tested once a month. An information label near the consumer unit explains this The resistor passes more current than that required for tripping, and the duration of the test is not limited, so testing in this way does not provide proof that the unit is working to specification. RCDs can also be switched off manually and can take the place of the isolator switch in the consumer unit, if they break live and neutral.
The second condition applies to any circuits where an earth fault current is not sufficient to blow the fuse, or trip the switch, in the designated time allowance made in the regulations. This generally applies to higher Amp rated appliances (showers, cookers etc) but it should always be checked with an electrician as to which circuits need to be placed on the RCD side of the consumer unit.

MCB's

The Current ratings which MCBs are designated to deal with are now conforming to the international equivalent of our old imperial ratings. This standard is called the Renard current rating and supercedes the imperial ratings as far as MCBs are concerned. A 5 amp fuse can be replaced with a 6 amp MCB. A 15 amp fuse becomes a 16 amp MCB, a 20 amp fuse can be a 20 amp MCB, 30 amp fuse = 32 amp MCB and a 45 amp fuse must now be a 40 amp MCB.
Consumer Unit with MCB and main double pole isolation switch
Consumer Unit with MCB and main double pole isolation switch
Consumer Unit with MCB's and Buzz Bar
Consumer Unit with MCB's and Bus Bar
Top left shows the mains double pole isolating switch and an MCB clipped into place on the DIN bar. Top right shows two MCBs and the bus bar. When the MCBs are clipped onto the DIN bar, the bus bar is inserted into the live terminal at the bottom of the MCB. When screwed tight this gives live feed to all the MCBs.
Main double pole isolation switch on din bar
Main double pole isolation switch on din bar
live and neutral coming into the main double pole switch from the meter and earth terminal block
live and neutral coming into the main double pole switch from the meter and earth terminal block
Top left shows the live (K) and neutral (J) coming into the main double pole switch from the meter. These cables are called tails, and in this instance, with this type of unit, are 16mm cables. This will vary and you should always check with a qualified electrician. Top left shows the earth cable from the meter (L). This screws into the earth terminal block.
Live connected to MCB with neutral going to RCD neutral terminal block
Live connected to MCB with neutral going to RCD neutral terminal block
Top right of the above image shows how a circuit cable is introduced to the unit. In this case it is a 2.5mm cable for the ring main. The live (O) is fixed into the top of an MCB on the RCD side of the unit, while the neutral (M) goes to the RCD neutral terminal block. The earth (N*) (which has been left unsheathed for clarity ). Each circuit cable is fed into the consumer unit and connected to an MCB of the appropriate rating.

Thursday, 12 February 2015

Consumer Unit Replacements East renfrewshire

Changing a consumer unit


Follow us on Facebook

This article discusses the reasons why you may need to change or upgrade a Consumer Unit (CU) aka "Fuse Box", and covers the procedures to follow. 

Contact WES ELECTRICAL 0141 840 5236


General Guidance

Note that this represent major electrical work, and should not be attempted unless you are confident that you understand the technicalities involved, and can produce an adequate standard of workmanship. 
You will also need access to specialist test equipment such as an earth loop impedance tester, and insulation resistance tester, a low ohms meter, and a RCD tester (or equivalent multifunction tester). 
You should have access to a copy of the IEE on-site guide and a copy of the IEE Wiring regulations.
Note that most of the work described here would be classed as a "notifiable work" under Part P of the building regulations.

Additional Safety Advice

When carrying out earth fault loop tests, and insulation resistance tests on virgin installations, one should take great care to ensure that no other occupants of the house are put at risk of exposure to high touch voltages should it turn out there is a failure in some part of the protective infrastructure, and that adequate warnings are given before testing.

Reasons for a change

Old switchfuse
There is often an implicit assumption that a modern CU with resettable Miniature CIrcuit Breakers (MCBs) will be "better" than an existing one that has cartridge or re-wireable fuses. It is important to understand that both types of fused circuit protection are still permissible in the current wiring regulations, and can offer the required levels of protection. There are also disadvantages to changing from fuses to MCBs in some cases. 

Reasons to change

  1. You need provision for more circuits
  2. The existing CU is damaged in some way
  3. You need to better integrate (or provide for the first time) RCD protection for circuits.
  4. You have a rewireable fuse CU and there is a risk that uninformed people may attempt to re-wire a fuse with the incorrect rating wire.
  5. You have older PVC T&E power cabling with undersized earth wires and re-wireable fuses. 
  6. You need to separate out circuits to allow independent control - say for time switched electric heating, or for a power feed to an outbuilding.
  7. To rationalize or simplify an existing system which is complex (either just to reclaim space, or to make use of the system less prone to errors).

Potential pitfalls

In many cases a new CU fitted with MCBs will be upgrading an older CU fitted with fuses (either cartridge or re-wireable). There are a number of problems that may manifest as a result:
  1. Nuisance trips. Compared to fuses, modern MCBs react more quickly to very short term overloads, and may result in loss of power to a whole lighting circuit when a bulb blows. 
  2. Discrimination: it can be harder to ensure that the circuit protective device nearest to a fault will be the only one to open when you have cascaded MCBs - sometimes upstream fuses interoperate better with downstream MCBs
  3. Expense: Changing a CU can be expensive, and may not bring significant benefits in overall safety. There may be other more serious problems with an electrical installation that are better addressed first.
  4. Extra work: Fitting a CU with RCD can often result in the installation not working initially due to hitherto unnoticed faults in circuits such as a borrowed neutral or higher than expected earth leakage. While discovering these faults is not a bad thing, it can force the investigation and repair of a number of other issues not directly related to the original task planned, causing unexpected cost and delay. 
Note that steps can be taken to minimise these potential problems, such as using HRC fuses where more appropriate (e.g. feeding submains to outbuilding CUs), or using type C MCBs on lighting circuits etc.

Planning

Location

Consumer units typically need to be within 2m of the electricity meter unless an additional switch fuse is fitted to protect the tails. They should not be mounted on the electricity suppliers meter board (although this is quite often seen). An ideal location should also make access to the CU easy without need to resort to ladders or climbing past obstructions - since you may be doing it in the dark. 

Ways

The spaces into which circuit breakers and other devices may be fitted are called "ways". Generally each device (and hence often each circuit) will take at least one way. When selecting a new CU, it is wise to choose one with enough ways to accommodate all of the proposed circuits, and to leave a few spare ones for future applications. Note also that some devices that can be mounted in a CU such as contactors, time clocks, bell transformers etc, may be wider than a standard single module and hence take more than one "way", and some of these more exotic devices may also require a space to be left beside them to facilitate cooling.

RCDs

Any modern CU will typically feature at least one RCD, and quite probably more in new designs. 

Split Load Vs Multiple

When selecting a CU, one option that is often overlooked is to use more than one CU rather than one big split load one. For example, it may be simpler to position a pair of smaller CUs in a confined space giving adequate free ways. 
In the case of houses with TT Earthing, the normal 16th edition style single CU solution involves a 100mA time delayed RCD in the position of the main switch, with the 30mA RCD in the split load position (the time delay resolving the problem of discrimination between the RCDs under fault conditions). Using two CUs will allow a normal 100mA RCD to be used on one CU dedicated to circuits that do not require direct contact protection, and the other for socket circuits etc. This will save the cost of a time delayed RCD since there is no need to cascade RCDs in this case.

Service Connector Block / Henley block

Multiple CUs can each be fed from their own set of tails. A Service Connector Block (aka "Henley Block") is a large junction box that can be used to split the tails from the meter or main switch enclosure, to allow the feeding of multiple CUs. Note these are available in single pole and double pole. The double pole devices will accommodate splits of both the Line and Neutral tails of a typical domestic supply in a single unit.

External main switch

When more that one CU is fitted, it is often worthwhile fitting an additional single "main switch" so that the capability to kill all power to all circuits with one action is retained.

Selecting Equipment

The immediate choice you will be presented with is the choice of metal clad or "insulated" (i.e. plastic) CUs. On TN [1] systems either can be used. The metal clad ones are better if you need to terminate cables like SWA with glands. The plastic ones are better for smaller installs where the ability to easily cut out only small sections for cable entry is handy. 
With a TT install you will need to use a plastic CU since this minimises the possibility of a phase to earth fault occurring inside the CU before the RCD (and hence never being cleared due to the high earth fault loop impedance of the local earth spike). 
One should also check that the breaking capacity of the selected protective devices is adequate. Typically modern MCBs can break fault currents up to 6kA. This is usually more than adequate. However if you live in a large densely populated city, or very close to a substation then you should use the appropriate test equipment (most earth fault loop testers will have a capability to measure the prospective short circuit current) to measure the maximum prospective short circuit current to ensure it is below the maximum limit that can be safely broken by the selected MCBs. In situations where 6kA is inadequate, the use of HRC cartridge fuses may be more appropriate, or using some of the ranges of consumer unit and circuit breakers with higher breaking capacity designed for industrial or commercial use.
Finally, many CUs will have their main isolator switch on the right hand side, however this is not universal and different brands of CU may favour placing the main switch on the left. Some can be reconfigured to your preference. The position of your electricity meter and the length of the tails may dictate that tails entry on a particular side is required.

Other work

One job that frequently needs doing with a CU replacement is installation or upgrading of the main equipotential bonds between the main earthing point and the metallic services entering the building. 

Starting work

Plan your work schedule carefully. Make sure you have enough time allotted to complete (or at least advance it to a appropriate intermediate stage) in the time / light available. Make sure any cordless tools you need are charged, and that batteries in test equipment are ok. You will also need to ensure you have enough natural light or suitable additional lighting to carry out the work safely. Head mounted LED torches are ideal for this sort of work. Again make sure you have spare batteries. Ensure you have adequate spare cable / wire to hand plus crimps and junctions boxes etc should you need to extend circuit wires. 

Disconnecting the power

Prior to replacement of the CU it is necessary to isolate the power feed to it. Some installations have an isolation switch for this purpose, however many don't and the other most readily available method is to remove the main service fuse. The official way to do this is to seek a temporary disconnection of the supply. More details on the procedure can be found here.
Removal of the electricity distributor's main fuse yourself is not legal, however it is common practice. Unofficially it is reported that many of the supply companies would prefer electricians do this, rather than take the risk of working live. 
Great care must be taken when removing the fuse. It must only ever be pulled when there is no load on any of the circuits (i.e. all existing CU(s) turned off). These fuseholders may be of historic design (possibly dating from the 1940's or earlier), and may lack even fairly basic safety guarding. Touchable metalwork inside the fuse enclosure can be assumed to be live. Please see the additional notes in this article.

Working Live

It is possible to remove the tails and tape the ends over, but this is not recommended, as it does constitute a risk of injury, loss of sight and to life. Live working should not be attempted unless one has the correct equipment and knowledge to allow this to be done safely. 

Labelling

Start by identifying and labelling all the existing cables that enter the current CU before disconnecting the wires. One mistake here can cause a fair bit of trouble later!

Removing the Old CU

Depending on the design of the old CU it may be necessary to remove the fuses or circuit breakers first to be able to disconnect the circuit wires. You will probably need to straighten the wires to allow them to be pulled through the cable entry holes in the old CU. 
Take care if there is any old rubber cable present, since these will have fragile insulation easily damaged. As a general rule rubber wired circuits are not fit for re-use typically due to insulation breakdown, and undersized protective conductors. In some limited cases it may be possible to re-connect a rubber insulated cable, in which case great care will need to be taken to not damage the insulation while disconnecting and removing the wires.

Intermediate tests

Once the old CU is out of the way, this is an ideal time to make checks on the existing circuit wiring. Round trip low ohms tests on ring circuits can now be carried out easily since both ends of the ring are readily available. Insulation resistance tests on individual circuits are also easy to carry out. If you find faults at this stage (like a ring circuit that has a broken loop) you may need to mark this for later attention rather than divert activity away from the main task now. You can always leave one circuit disconnected when reconnecting at the CU later. Some simple tests at this stage can also help identify likely causes of nuisance RCD trip later (like borrowed neutrals or earth / neutral shorts). 
(recording the test results as you go can save some work later)

Installing new CU

Prepare the new CU

First check and setup the CU as you require it. This may mean you need to choose where splits will occur on split load units. Often this will require the cutting of the live busbar to the required number of ways for each section. Even if the CU is apparently already setup correctly you need to make sure that all connections are tightly made and in the right place. 
The New CU does not have to be in the same location as the previous one. Obviously if it is some distance away then the existing circuit wires will need to be extended. Even with a CU in the same location as before it is not uncommon for wire extensions to be required inside the box simply due to different layouts. Inside the CU individual wire extensions may be crimped on. Outside the CU then either junction boxes will be required, or fully insulated cable crimped joints be made.

Fix the Equipment

You may find it easier to fit any service connector blocks and smaller switch enclosures before the main CU is in place. 
Fix the CU in place - if this is going to require masonry fixings take care that you are not going to drill into any buried wires!

Connect the supply

Next the main earth connection plus the supply tails from the meter / switch / service block can be installed. These will need to be done using suitable size tails (typically 16mm² for supplies up to 80A, and 25mm² for 100A supplies). Once the main supply connections are in place you can carry out a visual inspection and a a couple of quick sanity checks with a multimeter to ensure you have got the polarity correct and there are no shorts on the supply.

Install protective devices

Depending on the design of the CU it may be easier to install all the protective devices at the start, or it may be easier to do them one at a time as you reconnect each circuit. The latter approach is least open to error. 

Re-connect circuit wires

Connect each circuit in turn following your labelling. If you have new circuits to introduce that were not connected to the old CU it can be worth leaving those until you have restored the original functionality and tested it. 

Labelling

The MCBs or fuses should be labelled to show what circuits they supply. Installations using both wiring colour codes are required to have a notice fixed by the CU stating that both colour codes are in use. It is a good idea to label as you go to save confusion later. 

Testing CU main wiring

Once all the circuits are connected, another visual inspection can be done, and you can go over all the screw connections again to ensure they are tight. Check busbar connections to the main switch / RCD as well. A final sanity check with a multimeter will also catch any silly mistakes. 
You can carry out a full installation insulation resistance check at this point also (taking care to protect any sensitive electronic equipment wired to the circuits first!)

Reconnecting power

With all the CUs turned off the power to the CU can now be restored (fuse replaced etc). All the individual ways should be turned off on the CU before turning on its main switch. 
At this stage you can carry out full RCD tests using an appropriate tester. 
Each of the individual circuits can then be turned back on one at a time, and functional checks be carried out.

Resolving Problems

If all goes well you should now have a working electrical system again. However in a minority of cases you could meet problems. These may be ones that you have introduced during the CU change, or often, they are ones that were always there but did not make their presence felt until now. 

Nuisance RCD trips

It is not uncommon for a new CU to trip the RCD as soon as power is turned on. There are a number of common causes of this, which are addressed in the RCD article.

MCB trips

MCBs trip when too much current flows in the circuit they supply. Since the odds of an appliance fault developing while you replace a CU are small, the likely causes of MCB tripping when a CU is replaced are:
  • a circuit miswired during the works (eg when fixing another fault)
  • wrong rating of MCB fitted

Wednesday, 7 January 2015

Main Consumer Units

Fired-up over consumer units

A number of fire investigators throughout the UK have noticed a recent trend with an increasing number of fires involving plastic consumer units.

Figure 1: A consumer unit located under the stairs in a terraced three-storey house
In the last five years, the Glasgow Fire Brigade has investigated 107 fires (October 2006 to October 2011), and in the last 12 months it has identified a 100% increase in these incidents, with 45 investigations concluding that the fire originated within a plastic consumer unit. 

There are several types of fault that lead to the ignition of the plastic enclosure/casing. The most common is localised resistance heating at the connection of the neutral link (solid or flexible) terminal connection bar. These conductors are used to connect the main isolation switch and the neutral connection/terminal bar. Other areas where a neutral connection fault can occur are additional neutral conductor links to connect other components (such as the conductor linking the main neutral connection terminal bar to the Residual Current Device (RCD[s]).

In general, electrical installation contractors may perceive neutral connections as less hazardous than the live connections. However, in a single-phase consumer unit the total current for the final circuits is flowing through the main neutral connections, which are just as susceptible to poor connections as the live connections. Other locations of defective connections that have resulted in the ignition of a plastic consumer unit are the connections at the input or output of a main isolator switch or the connections of an RCD.

What are the problems that lead to these defective connections? 

Poor workmanship by the installer is a one factor. The use of inappropriate tools, distraction when making final connections, not re-checking connections (particularly on larger conductors) or not checking the tightness of factory made connections can all lead to localised resistance heating. 

The actual construction of the connections by the manufacturer is another potential issue. Indeed, Nick Carey has noticed a significant change in the construction of connections/terminations within consumer units over the last 10 to 15 years. 
The use of one fixing screw per connection instead of two screws, the use of plated steel fixing screws instead of brass screws, quality issues with threads and quality issues with burrs of metal at the end of screws that limit the conductor/screw contact area. There has also been a change from rigid plastics to more aesthetically pleasing moulded plastic enclosures. 

The change with enclosure construction has also coincided with a product that electricians find easier and quicker to install, with soft plastic openings that are simple to remove and adapt for cable entry points.
Figure 2: Typical fire damage to the enclosure of a plastic consumer unit in a fire confined to the under stairs cupboard of a two storey house
Another more recent problem affecting several brands of consumer unit is a manufacturing defect within Miniature Circuit Breakers (MCBs) leading to resistance heating at the switching contacts area.
What are effects of these fires? 

The changes to the type of plastics used to construct consumer unit enclosures in the last 10-15 years and pressures on manufacturers to be environmentally friendly has led to a reduction or even an omission of fire retardants in the plastic used to construct the enclosures.

The results of fire investigations where physical evidence has identified the fire originating within a plastic consumer unit is that defective connections have led to the ignition and destruction of the plastic enclosures. The fire often develops to involve the entire plastic enclosure with burning droplets of plastic falling to the floor that on occasions can start secondary fires below. Other items stored or installed adjacent to the consumer units determine how the fire develops from this point. Some of the fires have also involved gas pipes, which has significantly increased the fire development. 

The fires have also injured a number of occupiers. Typically the injuries are smoke inhalation but there have been some burn injuries. Fortunately, to date, there have not been any recorded fatalities. However, there have been a number of near misses with the fire service rescuing occupiers trapped by the fire within their properties.
In one recent case, the consumer unit was located under the stairs in a terraced three-storey house (as shown in figure 1). The quantity of storage within the cupboard and the involvement of the timber staircase ensured the fire spread to the top floor. The fire was discovered by one of the occupiers at 1am and the other nine occupants were quickly alerted to the fire and they all successfully evacuated. The damage to the consumer unit was so extensive that it was not possible to identify the product brand.

Fires involving plastic consumer units often only leave the remains of the main switch, RCDs and MCBs with the remains suspended by the final circuit conductors. The plastics used in the casings of the main switch, RCDs and MCBs contain flame-retardants and are designed to withstand significantly higher temperatures than the plastics used in the enclosures. 

Smoke being produced by the fire began to overwhelm the dedicated extraction system of the test facility
Figure 2 details the typical fire damage to the enclosure of a plastic consumer unit in a fire confined to the under stairs cupboard of a two storey house.

Ignition tests

A recent series of ignition tests was undertaken on five brands of plastic consumer units. The tests were initiated by the Glasgow Fire Brigade and undertaken with the collaboration of Bureau Veritas Solutions and the Electrical Safety Council. Initial tests identified that three of the five plastic enclosures did not use a flame retardant in the plastic. The other two brands used enclosures with a flame retardant incorporated in the plastic.

The first series of tests were confined to replicating the hot wire material test as specified in BS/EN 60947-1: 2007 + A1:2011. Criticism could be raised by the manufactures of consumer units as BS/EN 60947 is not a ‘product test’. However, the test successfully identified the ease in which the plastics used in the construction of the enclosures were ignited. A pre-conditioned hot wire is wrapped around a plastic sample and the wire is then energised with prescriptive electrical limits for up to 30 seconds. In these tests a maximum wire temperature of 550°C was measured.

The results of the hot wire tests were that with the exception of one sample of plastic that had a flame retardant, all of the plastic samples ignited irrespective of whether they did or did not have a flame retardant incorporated in the plastic. The shortest time to flaming ignition was 11 seconds for a plastic sample without a flame retardant and 16 seconds for a plastic sample with a flame retardant. 

All five plastic consumer unit enclosures were subjected to a needle flame test in accordance with the EN 60695-11-5:2005 standard. The needle flame was introduced into the consumer unit via a small opening to enable access to the main neutral connection at the neutral connection bar.

One of the consumer units with a flame retardant did not ignite and the flame was applied at four additional areas, again without ignition. The second consumer unit with a flame retardant ignited and once the needle flame was removed, the flame self-extinguished within eight seconds. 

The remaining three consumer unit ignition tests resulted in fires that spread from the initial needle flame to involve the entire plastic enclosure. The shortest time from needle flame application to the ignition of the plastic was eight seconds. Two of the ignition tests had to be halted after four minutes as the smoke being produced by the fire began to overwhelm the dedicated extraction system of the test facility (figure 3). 

Plastic Consumer Units in the UK have to be constructed in accordance with BS EN 60439 (replaced in 2011 by BS EN 61438). The plastic enclosures have to withstand 660°C glow wire product tests. The opinion of the author is that this test is not sufficient to ensure the safety of the occupiers in properties where plastic consumer units are installed. 
The data previously detailing fires that have originated within consumer units in the Glasgow area, resulting from various types of defective electrical connections, shows an increase in these life-threatening fires. 
The plastics used in the construction of consumer unit enclosures should therefore be more resistant to ignition from an internal defective electrical connection. In addition, the product should be constructed to ensure that any localised heating within the consumer unit should be contained within the product.